Campos Góticos Drinking Water Treatment Plant (DWTP), Medina de Ríoseco

Technical Specifications


Characteristics: DWTP supplying Medina de Ríoseco and Zona Oeste

Location: Medina de Ríoseco (Valladolid)

Customer: SOMACYL

Completion time: 15 months for the completion of the works and 24 months of operation

Status: Completed in September 2013, 2 years of operation of the plant until September 2015

Description


Construction of a new DWTP to increase the flow treated (239.5 m3/h per line, 479.02 m3/h in total). The treated water is stored in a reinforced concrete tank with a capacity of 4,092.35 m3. All these facilities are housed in a purpose-built plant.